Setup and Operation
Two-person operation
3
3-4 doc061821 Setup and Operation
15. Pull the pallet away from the blade.
NOTE: Move the pallet from side-to-side as you pull to ease the
cut.
16. Lift and rotate the pallet to remove the other half of the boards.
17. Turn the pallet over and repeat Step 14. through Step 16.
18. Remove the last board by pulling the stringers from left to right.
Two-person operation
IMPORTANT! Before starting, ensure the blade is tensioned prop-
erly. Failure to do so may result in drive wheel tire damage.
1. Tighten the tension by ratcheting the device handle until the pivot arm is touching the stop
bolt.
See Figure 3-3.
NOTE: If a new blade is required see Section 4.3 Changing the blade.
2. Momentarily (approximately 15 seconds) start the blade.
3. Turn off power.
4. Open the wheel covers to inspect the blade tracking.
FIG. 3-3
Tension ratchet
handle
Stop bolt