EasyManua.ls Logo

Woodstock Soapstone Fireview 205 User Manual

Default Icon
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Model 205 Fireview Maintenance Kit
Please read all of the instructions before you begin the procedure. Confirm
that you have all the necessary tools and parts required. Allow about one
hour to complete the procedure. If you have any questions, technical support
is available toll free at 1-800-866-4344, Monday- Saturday 9:00-5:00 ET.
Tools Needed:
- ½” wrench or socket
- Putty knife
- Wire brush
- Vacuum
- WD-40 or similar penetrating liquid
- Standard size caulk gun
- Sharp scissors
- 7/16” wrench and socket
- 1/8” allen wrench
Materials included in maintenance kit:
- 3’ .375G gasket- Loading door
- 3’ .500 gasket- Bypass frame
- 3’ .250 gasket- Under combustor
- 8’ adhesive window gasket- surrounding glass
- 7’ .500 gasket OR 7’ .375MX gasket - top lid
- 7’ .250 gasket- around air duct cover
- 1 tube stove cement
- gasket glue
- #00 steel wool
The gasket in your kit has been roughly cut to size and marked with its
diameter and length. To determine its exact length, dry fit the gasket in its
appropriate location and then re-cut. Gasket glue or furnace cement will then
be applied to secure each length in its proper place. The steel wool provided

Other manuals for Woodstock Soapstone Fireview 205

Question and Answer IconNeed help?

Do you have a question about the Woodstock Soapstone Fireview 205 and is the answer not in the manual?

Woodstock Soapstone Fireview 205 Specifications

General IconGeneral
BrandWoodstock Soapstone
ModelFireview 205
CategoryWood stove
LanguageEnglish

Summary

Replacing Loading Door Gasket

Preparation and Door Removal

Prepare stove, gather materials, and remove the loading door.

Old Gasket Removal and Channel Cleaning

Remove old gasket and clean the channel on the loading door.

New Gasket Installation

Dry fit, cut, and install the new gasket with cement.

Door Reinstallation and Adjustment

Reattach the loading door and adjust its tension.

Curing Time for Stove Cement

Allow stove cement to cure for 24 hours before use.

Replacing Bypass Frame Gasket

Preparation and Access to Bypass Area

Prepare stove, gather materials, and access the bypass door area.

Bypass Frame Gasket Removal and Cleaning

Remove bypass lift guide, old gasket, and clean the channel.

Bypass Frame Gasket Installation

Dry fit, cut, and install new gasket with glue.

Bypass Door Adjustment and Reassembly

Close bypass door, attach guide, adjust tension for seal.

Combustor Gasket Consideration

Reinstall combustor or replace gasket under it.

Replacing Combustor Gasket

Preparation and Combustor Removal

Prepare stove, gather materials, and remove combustor.

Combustor Area Gasket Removal and Cleaning

Remove old gasket and clean area under combustor.

Combustor Gasket Installation

Dry fit, cut, and install new gasket with glue.

Combustor Reinstallation

Reinstall the combustor into the stove.

Replacing Window Gasket

Preparation and Component Removal

Prepare stove, gather materials, remove scoop and metal.

Firebox Component Removal

Remove andirons, retainer, and window clips.

Glass Panel Removal

Remove glass panels from the front frame.

Glass Cleaning and Exterior Gasket Application

Clean glass and apply gasket to exterior panel.

Interior Gasket Application

Apply gasket to interior glass, considering air wash.

Glass Panel Reinstallation and Alignment

Place, align, and secure glass panels with clips, reattach hardware.

Air Guide Gap Check and Adjustment

Check and adjust gap between interior glass and air guide.

Component Replacement

Replace combustor scoop and expanded metal.

Replacing Top Lid Gasket

Preparation and Top Lid Removal

Prepare stove, gather materials, and remove top lid.

Top Lid Gasket Removal and Fitting

Remove old gasket, clean lid, and dry fit new gasket.

Top Lid Gasket Installation and Curing

Apply glue, seat gasket, allow to set, and reinstall lid.

Replacing Air Duct Cover Gasket

Preparation and Gasket Removal

Prepare stove, remove lid, remove old gasket, clean cover.

Air Duct Cover Gasket Installation

Apply cement and install new gasket into air duct cover.

Lid Reinstallation and Curing

Reinstall top lid and allow furnace cement to cure.

Sealing Firebox Seams

Firebox Preparation and Cleaning

Ensure fire is out, remove ash, and clean loose cement.

Seam Sealing and Curing Process

Apply new cement, smooth, and allow to cure.