Manual 26174 EGCP-2 Engine Generator Control Package
Woodward 93
Unload Time
Time in seconds for generator to unload from base load level to unload trip
level. This ramp rate is applied during any automatic unload functions,
including ramping from load sharing.
Example: Unload Time = 10 seconds
o Base Load Ref = 200 kW
o Unload Trip = 25 kW
o The difference is 175 kW
o The EGCP-2 will ramp 175 kW in 10 seconds
o This breaks down to 17.5 kW per second
Remember, if the Base Load Ref or Unload Trip is changed, it will affect the
ramping rate when unloading.
Raise Load Rate
Percent Load per Second ramp rate used when the Raise Load input
(Discrete Input #6) or Modbus address AW40300 is used during base load
operation.
Lower Load Rate
Percent per Second Ramp Rate used when the Load Lower input (Discrete
Input #7) or Modbus address AW40300 is used in base load operation.
KW Load High Limit
Maximum allowed load while operating in Base load or Process control
modes.
Prevents overload of unit when in Base load or Process control modes.
KW High Limit Alarm
Sets Alarm Action when unit is at or above High Load Limit.
Active during all load control operations.
Unit will not exceed High Limit set point when operating in Base Load or
Process Control Modes.
KW Load Low Limit
Active during all load control operations.
Sets alarm mode when unit is at or below Gen Low Load Limit.
Minimum allowed load while operating in Base load or Process control
modes.
Prevents reverse current of unit.
KW Low Limit Alarm
Sets Alarm Action when unit is at or below Low Load Limit.
Active during all load control operations.
KVA Switch Low
Sets level, which when exceeded, will cause the kVA relay output to
energize. Only applicable for units with the relay#12 function configured for
kVA Load Switch.