EGCP-2 Engine Generator Control Package Manual 26174
118 Woodward
Mains Sensing
Over/Under Voltage
Over/Under Frequency
Load Surge
Programmable for Alarm/Loss of Mains Detect
Loss of Mains Action Timer
Stable Mains determined by being within Voltage and Frequency Limits for a
given period of time
Synchronizing
Phase Match Synchronization
3 Mode Operation
Run, Check, Permissive
Voltage Matching
Dead Bus Closing
Synch Timer
Reclose Attempt/Timer
Manual Synchronization Capability (permissive mode)
Load Control
Proportional Load Sharing
Integrating Base Load and Process Control
Load Ramping
Remote Contact Inputs to change Base Load and Process Set Points with
Raise/Lower ramp rates
Unload Trip point
Droop Load Control Capability
Sequencing
Each Unit in the system has an assigned Priority.
Master (Highest Priority) automatically sequences units on or off line as
determined by system load.
Higher priority units are sequenced on in order of their priority; taken off in
reverse of priority.
System Load set point determines percent system load level at which
additional units will be brought on, or taken off line.
Time set points determine period of delay for sequencing units on/off line.
Separate time delay for overload (100% +) system load levels so additional
units can be sequenced on line quickly.