Installation
2–8 152602
To make PV Array #1 and GT100E #1 connections:
1. Route the PV Array #1 cables through the access panel and connect
the cables to PV ARRAY #1 PV(+) and PV(-) terminals, see Figure 2-
5.
2. Route the GT100E #1 cables through the access panel and connect the
cables to GT100E #1 PV(+) UNIT and PV(-) terminals, see Figure 2-
5.
3. Route the PV Array #1 ground cable through the access panel and
connect the cable to PV ARRAY #1 GND terminal, see Figure 2-5.
Figure 2-5
PV Array #1 and GT100E #1 Connections
Combiner Box
PV ARRAY #1
GND Terminal
Combiner Box
PV ARRAY #1
PV (+) Terminal
Combiner Box
PV ARRAY #1
PV (-) Terminal
Combiner Box
GT100E #1
PV (+) Terminal
Combiner Box
GT100E #1
PV (-) Terminal