EasyManua.ls Logo

Xerox WorkCentre Pro 423 - Page 434

Xerox WorkCentre Pro 423
619 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
03/02 Contents
WorkCentre Pro 423/428 6-17 CHAPTER 6 GENERAL
6.5 Installation
Note IOT and IIT should be installed by a service engineer.
Unpacking and Assembling
Note Unpack 2-Tray Module, IOT, then IIT.
CAUTION
When opening the package and taking the IOT out of the carton, extract Tray 1 first to make
room at the handles. (Figure-1).
(Figure 1) j0hn6501
1. Check Accessories
Note This procedure below is based on WorkCentre Pro 423/428. Procedures for other
models, which are different from WorkCentre Pro 423/428 are also included here.
l Accessories for 2-Tray Module (Figure-2)
 Main Unit 1
 Size & Label 1 set
 Bracket (for fixed) 2 pieces
 Screw 2
 Fall Prevention Foot 1
 Screw (silver) 2
 Screw (black) 1
(Figure 2) j0hn6502

Table of Contents

Other manuals for Xerox WorkCentre Pro 423

Related product manuals