03/02 Contents
WorkCentre Pro 423/428 6-17 CHAPTER 6 GENERAL
6.5 Installation
Note IOT and IIT should be installed by a service engineer.
Unpacking and Assembling
Note Unpack 2-Tray Module, IOT, then IIT.
CAUTION
When opening the package and taking the IOT out of the carton, extract Tray 1 first to make
room at the handles. (Figure-1).
(Figure 1) j0hn6501
1. Check Accessories
Note This procedure below is based on WorkCentre Pro 423/428. Procedures for other
models, which are different from WorkCentre Pro 423/428 are also included here.
l Accessories for 2-Tray Module (Figure-2)
Main Unit 1
Size & Label 1 set
Bracket (for fixed) 2 pieces
Screw 2
Fall Prevention Foot 1
Screw (silver) 2
Screw (black) 1
(Figure 2) j0hn6502