EasyManua.ls Logo

Xinje XS Series - 3-4-4. Installation Environment

Xinje XS Series
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
Please use screws to fix the screw hole under the
module #1
Continue to install the following modules in the
same way. The effect is shown in the following figure.
Note:
1: If the power module XG-P75-E is selected, please install the power module to the left side of the PLC body
according to the installation steps ~ .
2: The R port on the back of the last expansion module does not need to install U-connector.
(3) XSLH series installation
Installation of basic unit and expansion module, rail installation is optional.
Use DIN46277 rail to install
XSLH-30A32
FG
0V
24V
A
B
ECAT
ENET
CAN+
CAN-
GND
COM1
The unit and expansion module are installed on DIN46277 guide rail (35mm wide). To remove, just pull down
the assembly hook of the DIN rail and remove the product by translating it to the right.
3-4-4. Installation environment
Please install the product under the environmental conditions specified in chapter 2-1-1.
DIN rail hook

Table of Contents