Technical Support US: 888-443-2751 Technical Support INTL: 316-943-2751
35
OVEN SERVICE PROCEDURES
Check Incoming Pressure:
Loosen screw one (1) full turn counter clockwise (Figure 1)
Connect Manometer to this test port
Turn the LUI to on position and wait for burner to light (up to 30 seconds)
Document incoming pressure on startup checklist. (If new installation)
Disconnect Manometer
Tighten screw clockwise until snug (Figure 2)
On-Off Valve Adjustment Procedure
Figure 1
Figure 2
Natural Gas LP Gas
W/C mbar kPa W/C mbar kPa kPa kPa W/C mbar kPa W/C mbar kPa
All 6-14 15-35 1.50-3.50 11.5-14 27.5-35 2.75-3.50 1.50-2.50 2.30-3.30 3.5 8.75 0.875 10 25 2.5