EasyManua.ls Logo

XLT Ovens X3F3-1832 Series - Installation Responsibilities; Site Survey and Preparation; Installation Tasks

XLT Ovens X3F3-1832 Series
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technical Support US: 888-443-2751 Technical Support INTL: 316-943-2751
7
INSTALLATION RESPONSIBILITIES
Site Survey: Verify electric and gas meter/regulator sizes X
Supply wiring from TS1 #R3, R4, R5 to exhaust fan X
Supply (1) single phase 230 volt 10 amp circuit from breaker panel to
XLT Hood
X
Assembly of new hood per XLT Installation & Operation Manual X
Suspend XLT Hood from ceiling X
Install new exhaust fan on roof X
Supply power to XLT Hood X
Install Duct Cover or Valance above XLT Hood X
Assembly of new ovens per XLT Installation & Operation Manual
Stands assembled and set in place X
Ovens moved and stacked with proper lifting equipment X
Assemble shrouds & brackets to XLT Oven/Hood X
Connecting fuel to XLT products
Install piping and drip legs X
Weld ducting to XLT Hood X
Check for leaks X
Install flexible gas hoses X
Connect electrical supply X
Connection may require Permit and Code Inspections X
Relocate Make-Up-Air to enter the room at the ends of the ovens X
Start-up per XLT Installation & Operation Manual: X
Gas pressure/leak testing, hood/oven functions, adjust as necessary X
Start-Up Checklist must be submitted to XLT to validate Warranty X
Owner/
Contractor
XLT/Service
Company
Responsibility

Related product manuals