EasyManua.ls Logo

Yardistry YM12863 - Page 70

Yardistry YM12863
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
70 support@yardistrystructures.com
Roof PC
U-Channel
F10.13
Hardware
18 x #10 x 1-1/4” Pan Screw (black)
S12
Components
18 x EPDM Nylon Washer
4 x Roof PC U-Channel
2 x Long Roof PC U-Channel
Sealant
EPDM Nylon
Washer
Long Roof PC
U-Channel
Roof PC
U-Channel
Roof PC
U-Channel
Long Roof PC
U-Channel
Step 10: Roof Assembly
Part 5
F10.14
Repeat Step 10 for other side of roof.
See page 6 for Warning and
First Aid Information.
Note: All surfaces to be clean, dry, dust
and grease free before application with
temperatures above 5
°
C (41
°
F), no warmer
than 35
°
C (95
°
F).
• 󰀨
then put in caulking gun. See page 6.
• Apply sealant in small beads and smooth
as required.
• Clean excess with a cloth or paper towel
before it skins over.
• Always wear safety glasses and rubber
gloves when using product.
F10.15
Sealant
S12
Note: Apply bead
of sealant at top of
all PC U Channels
PC Wall Panel /
PC Wall Center
Roof PC U
Channel/ Long
Roof PC U
Channel
(black)

Related product manuals