EasyManua.ls Logo

Yardline RIDGEPOINTE - WALL ASSEMBLY; WALL PANEL INSTALLATION

Yardline RIDGEPOINTE
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
x40
2" (5,1 cm)
PARTS REQUIRED:
Place a  panel on the wall frame, as shown.
Locate the panel ush to the top plate.
Use the gauge block to mark the 3/4" side measurement on the wall stud.
Secure panel with (2) 2" nails in the corners 
2
Secure panel with 2" nails spaced 6" apart on edges and 12" apart inside panel.
EXAMPLE WALL
Ensure your wall is square by installing one panel and squaring frame.
Move to the opposite end. Using the long edge of the panel as a lever,
move the panel side-to-side until you have a 3/4" measurement on the wall stud.
Secure corner with (2) 2" nails .

Block
x1
3/8 x 48 x 72"
(1 x 121,9 x 182,9 cm)


BEGIN HERE
3/4"
(1,9 cm)
6" (15,2 cm)
12" (30,5 cm)

BLOCK
GAA
WALL PANEL INSTALLATION HINTS & EXAMPLES
BEGIN
1
Install all wall panels with the primed side facing up.
3/4"
(1,9 cm)

3/4"
(1,9 cm)
2 Nails

3/4"
(1,9 cm)
2 Nails


HINTS