Transportation
3 - 15
3.1.1 Using a crane
Adequate load handling devices must be used to transport the robot. Make sure that the
robot is lifted as shown in the diagram "Transport by crane".
Transport with crane
Wire rope (at least 1200 mm
long)
Shipping brackets and bolts
2 screws M12 x 30, 2 washers
M12 and 2 spring washers
M12
The position of the center of
gravity:
All dimensions in mm
1
346
266
1162
718
909
2
3
4