EasyManuals Logo

YASKAWA SGDS-***12A Series User Manual

YASKAWA SGDS-***12A Series
376 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #317 background imageLoading...
Page #317 background image
10 Inspection, Maintenance, and Troubleshooting
10.2.3 SERVOPACK’s Parts Replacement Schedule
10-26
10.2.3 SERVOPACK’s Parts Replacement Schedule
The following electric or electronic parts are subject to mechanical wear or deterioration over time. To avoid
failure, replace these parts at the frequency indicated.
The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the standard settings before
shipping. Be sure to confirm that the parameters are properly set before starting operation.
Table 10.8 Periodical Part Replacement
Part Standard
Replacement
Period
Replacement Method Operating Conditions
Cooling Fan
4 to 5 years
Replace with new part. Ambient Temperature: Annual
average of 30°C
• Load Factor: 80% max.
• Operation Rate: 20 hours/day
max.
Smoothing Capacitor
7 to 8 years
Test. Replace with new part if
necessary.
Relays
Test. Replace if necessary.
Fuses
10 years
Replace with new part.
Aluminum
Electrolytic
Capacitor on Circuit
Board
5 years
Test. Replace with new circuit
board if necessary.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YASKAWA SGDS-***12A Series and is the answer not in the manual?

YASKAWA SGDS-***12A Series Specifications

General IconGeneral
BrandYASKAWA
ModelSGDS-***12A Series
CategoryAmplifier
LanguageEnglish

Related product manuals