Deploying the Device
5. Remove the primary DM and
Base, and then insert the network
cable and power cable of the DM
into the ports of the W75 Mini MC
(Figure
"B/C"
).
6. When the indicator changes to the following, the secondary W75 Mini MC have been
successfully registered with the main DM system. Then disconnect the W75 Mini MC
(Figure
"B/C"
) from the primary W75 DM.
7. After the three W75 Mini MC are connected to the network and powered on, the LED
indicator status are as shown in the following.
⬇
⬇
⬇⬇
Primary W75 Mini MC
Primary DM
CB
LAN LED: green
LAN LED: green LAN LED: green
ROLE LED: orange/green
ROLE LED: orange ROLE LED: green
DECT LED: Solid green
for 3s and then off
DECT LED: green DECT LED: green
A
⬇⬇
Primary W75
Mini MC
CB
CB
Note:
During the deployment process, the primary DM needs to keep the POE or net-
work cable + power supply connected.
Note:
If it turns off after 3s, it means that the secondary DM and base are registered.
And the base can be unplugged after the LED indicator is off.