EasyManua.ls Logo

YOKOGAWA Centum-XL - Page 23

YOKOGAWA Centum-XL
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Procedure and Details of Upgrade
4-10
TI 33K01B10-50E
Precautions when upgrading the I/O card
• FIO(FieldnetworkI/O)contactI/Osallowthedesignationofoperationmodeonapoint-by-
point basis. The operation mode, which varies with the type of I/O module, is selected by the
IOM builder.
• Oddandeventerminalsinthepulsewidthoutputmoduleandthestatusoutput/pulse-
widthoutputintegratedmoduleareidenticallydenedforeverytwoterminals.Ifdifferent
denitionsareused,changesinwiringarerequired.
• Ifthefollowingcardsareused,theirhardwarespecicationsarechangedtosoftware
specications,so,theexistingsystemsshouldbeexamined.
- ST2/ST3/ST4/ST5/ST7cards:OutputvalueswhentheCPUinaeldcontrolstationfails
(hold/OFF)
- PB5: Signal detection (rising/falling)
- MX2/MX3: Presence or absence of burnup
• Instrumentsthatallocatetwo-pointconsecutiveDI/Os,suchasswitchinstrumentSIO-22in
CENTUM V and CENTUM-XL systems allow crossover allocations between cards, but, FIO
in the CENTUM VP system does not provide those allocations. DI/O should be converted
to %SW using a sequence table. Valve monitor functions and I/Os of a CI/CO cannot allow
crossover allocations between cards either.
Precautions when upgrading the existing SC card
If the bus of FIO is used, SC cards can upgraded on a card-by-card basis. If the following cards
areused,theirhardwarespecicationsarechangedtosoftwarespecications,so,theexisting
systems should be examined.
• EP1:Loadresistance(200Ω/510Ω/1kΩ)andltersettings(ON/OFF)
• ET5/ER5/EM1/ES1:Disconnectionprocessing(burnup,burndown,ornone)
• EA5/EH5:Square-rootinputprocessing
Mar. 27, 2015-00

Related product manuals