JOHNSON CONTROLS
135
SECTION 6 - PRINTING
FORM 161.01-OM1
ISSUE DATE: 6/8/2018
6
FIGURE 54 - SAMPLE PRINTOUT (SCHEDULE)
FIGURE 55 - SAMPLE PRINTOUT (SALES ORDER)
LD26762
YORK SCHEDULE
CHILLER ID 3
© 1997 - 1999 YORK INTERNATIONAL CORPORATION
MON 29 MAR 1999 1 27 PM
SCHEDULE = OFF
STANDARD SCHEDULE
---------------------------------------------------------------------------------
SUN START = OFF STOP = OFF
MON START = 8:00 AM STOP = 5:00 PM
TUE START = 8:00 AM STOP = 5:00 PM
WED START = 8:00 AM STOP = 5:00 PM
THU START = 8:00 AM STOP = 5:00 PM
FRI START = 8:00 AM STOP = 5:00 PM
SAT START = OFF STOP = OFF
EXCEPTION DAYS
---------------------------------------------------------------------------------
02 APR 1999 START = OFF STOP = OFF
13 APR 1999 START = 8:00 AM STOP = 10:00 PM
LD26763
YORK SALES ORDER
YZ ¬CHILLER ID 1
(C) 2010 JOHNSON CONTROLS
MON 01 NOV 2010 9:25:18 AM
ORDER INFORMATION
------------------------------------------------------
COMMISSIONING DATE =
JOB NAME = YORK BUILDING 36 CHILLER 1
SYSTEM MODEL = YZXXXXXX
YORK ORDER NUMBER
UNIT SERIAL NUMBER
COMPRESSOR MODEL
EVAPORATOR MODEL
CONDENSER MODEL
VSD MODEL
NAMEPLATE INFORMATION
------------------------------------------------------
CAPACITY (TONS OR KW)
REFRIGERANT
REFRIG WEIGHT (LBS OR KG)
RPM
INPUT KW
VOLTAGE
PHASES
FREQUENCY
INPUT JOB FLA
MIN CIRCUIT AMPACITY
DESIGN CONDITIONS - EVAPORATOR
------------------------------------------------------
EVAPORATOR PRESSURE DROP (FT OR KPA)
EVAPORATOR FLOW (GPM OR L/S)
EVAPORATOR LEAVING TEMPERATURE (°F OR °C)
EVAPORATOR ENTERING TEMPERATURE (°F OR °C)