EasyManua.ls Logo

YSI 2900 series - Page 29

YSI 2900 series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
Figure 2-11
4. Connect the Multi-Channel Online Monitor sample tubing to the sample probe Luer connector (Figure 2-12).
Figure 2-12
5. Clamp the Pharmed
®
tubing approximately 1 inch (2.5 cm) above the luer connector.
6. If the vessel will be autoclaved, secure the polypropylene bag to the side of the vessel or headplate using autoclave
tape. Ensure that the Multi-Channel Online Monitor sample tubing is not pinched or crimped near the FISP connector.
Figure 2-13 shows the proper position of the sample tubing at the FISP connection.
FISP Luer
Connector
PG 13.5 Nut
Sample Probe

Table of Contents

Related product manuals