ZANKER DE 13 - Completing the Installation; Commissioning (Only by a Qualified Contractor)

ZANKER DE 13
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
For contractors
3.8 Completing the installation
Click the lower part of the back panel (
E
3) into place.
3.9 Commissioning
1

Open and close all connected taps several times, until all air
has been vented from the pipework and the equipment.
Air – see "2.3 Important information".
2
Activate the safety pressure limiter AP 3.
The instantaneous water heater is delivered with the safety
pressure limiter triggered (press the reset button).
3


panel.
4
Switch ON the mains power.
5


Explain the equipment function to the user and familiarise them
with its operation.
Important information:
 
 
4
3
2
1