Humphrey Field Analyzer II-
i
series User Manual 2660021145640 A
Networking
14-35
(instrument startup). You can continue to take exams, and although you will not see this dialog box,
additional exam transfers will be deferred if the network is still down during the session.
Figure 14.38 Transfer Failed Dialog Box
By pressing the DEFER button, the exam can be transferred later (when the network is re-initialized)
by pressing the Transfer Deferred Tests button on the Save/Transmit Option screen. At instrument
startup, a message will be displayed if you have any deferred exams to be transferred (Figure 14.39).
Figure 14.39 Startup Deferred Exams Message
Pressing the Transfer Deferred Tests button displays a dialog box like the one in Figure 14.40. Select
YES to transfer the deferred test(s).
Figure 14.40 Proceed with Transfer Dialog Box
If you do not want these tests to be transferred, press the Clear Deferred Tests button. A dialog will
be displayed like that in Figure 14.41. Select YES to clear the deferred tests list.
Figure 14.41 Proceed with Clearing Deferred Tests List Dialog Box