EasyManua.ls Logo

Zephyr VISTA ISLAND DVL-E36ASSX - Page 20

Zephyr VISTA ISLAND DVL-E36ASSX
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Replace the lid by following the instructions from step 9 in reverse order, ensu-
ring that the tab on the lid is within the enclosure.
5. Having connected the equipment to the power supply, you can now continue
with the ceiling mounting instructions.
6. Secure the correct size ducting for your installation (not supplied) to the collar
on top of the housing. Fig.4
7. Secure the two upper duct covers to sup-
port frame with (4) screws. Fig.5
8. Secure the two lower duct covers parts to
the support frame by overlapping the la-
teral magnets. Fig.6
9. Verify that ducting from hood is con-
nected to ducting in the attic that will
exhaust air out of the home.
- 20 -

Related product manuals