EasyManua.ls Logo

Zte ZXDSL 931DII - Page 15

Zte ZXDSL 931DII
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ZXDSL 931DII User Manual
10
interface. Connect the user telephone cable port to the splitter LINE
interface.
4 Connect the power
Connect one power adapter terminal to the power interface of the ZXDSL
931DII, and the other terminal to the socket on the wall. Then switch ON the
ZXDSL 931DII equipment power.
Checking All Connection Cables
Check all connection cables according to the following steps:
1 Check the VDSL2 cable connection
If the Link LED is ON normally, it indicates that the VDSL2 line is correctly
connected (Generally it takes one to two minutes to perform the VDSL2
connection)
2 Check the computer connection
If both the computer Link LEDs are ON and the ZXDSL 931DII LAN LED
is green, it indicates that the computer and the ZXDSL 931DII equipment
are correctly connected
.
3 Check the telephone cable connection
If the received telephone signals are normal and free of noise, it indicates the
telephone cable is correctly connected. Power ON/OFF status of the ZXDSL
931DII will not affect the telephone.

Related product manuals