ZXR103900A/3200ASeriesHardwareInstallationManual
Power-onProcedure
Checktheequipmentroomenvironmentandhardwareinstallation
beforepoweringonZXR10RPS180.
1.Checkwhethertheequipmentroomtemperature,humidity
andvoltagemeettheinstallationrequirements,asshownin
Table14.
TABLE14TEMPERATUREANDHUMIDITY
Temperature()RH(%)
Item
Long-Term
Working
Condition
(Note1)
Short-Term
Working
Condition
(Note2)
Long-Term
Working
Condition
Long-Term
Working
Condition
Short-Term
Working
Condition
Scope15~30-5~4530%~70%20%~90%
1.UnderthenormalworkingenvironmentofZXR10RPS180,the
measurementvaluesoftemperatureandhumidityrefertothose
measuredat2mabovetheoorand0.4minfrontofthedevice(the
measurementisdonewithnoprotectiveboardinthefrontoratthe
backofthecabinet).
2.Theshort-termworkingconditionmeansacontinuousrunningperiod
ofnotmorethan48hours,andaccumulatedrunningperiodsayear
ofnomorethan15days.
2.Checkwhetherthepowercablesandthecablesareconnected
correctlyandreliablyornot.
3.Checkotherhardware.
4.PoweronZXR10RPS180inthefollowingsteps:
i.Turnontheexternalpowersupply.
ii.Turnonthepowerswitchonthebackplaneofswitch.
5.Poweroffprocedureisshownasfollows:
i.Turnoffthepowerswitchonthebackplaneofswitch.
ii.Turnofftheexternalpowersupply.