EasyManua.ls Logo

ABB Modures LZ91 - Page 26

ABB Modures LZ91
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
switch
6b
switch
7
switch
8a
switch
Sb
plug-in
link
plug-in
link
Ba
Sb
position
1
position
2
position
1
position
2
position
1
position
2
position
1
position
2
position
1
position
2
position
1
position
2
k =
0.1
kt
1
t
t
~
t4
4
_.
8b
t
~
I -
I
--
I
--
-
t
~
_J_~_...J
1-----t
PUTT
multiplier
for
the
3rd.
time
step
multiplier
for
the
3rd.
time
step
zone
4
directional
zone
4
non-directional
direction
has
indicated
on
Sb
direction
as
indicated
on
Sb,
but
~
zone
reversed
(see
Section
3.6).
Switch
8a
is
not
fitted
in
all
versions.
reverse
direction
forwards
direction,
if
relay
connected
as
in
our
diagram.
direction
as
set
on
I~
on
the
front-
plate
direction
as
set
on
I~
on
the
front-
plate,
but
one
zone
reversed.
overreaching
(intertripping
scheme,
see
Section
3
.10)
permissive
underreaching
transfer
tripping
(where
fitted)
.
3.10
Main
processing
unit
equipped
for
intertripping
schemes
Main
processing
units
with
PCB
8
acc.
to
HESG
440
718
(see
Section
3.12)
are
equipped
as
standard
with
the
auxiliary
components
for
operating
in
intertrip-
ping
schemes.
On
these
units
either
an
acceleration
scheme
(zone
extension)
or
permissive
underreaching
transfer
tripping
can
be
selected
using
plug-in
link
Sb
on
PCB
8
(see
Fig.
9.31).
In
the
case
of
an
acceleration
scheme
a
signal
from
the
opposite
station
causes
the
receiving
relay
to
switch
to
overreach-
ing,
whilst
in
the
permissive
underreaching
scheme
the
relays
have
a
normal
underreaching
setting
and
the
receiving
relay
trips,
providing
a
starting
unit
has
picked
up.
In
special
cases
the
PUTT
scheme
can
also
include
the
directio-
nal
measurement
of
the
receiving
relay
(soldered
link
LB20,
see
Fig.
9.32).

Related product manuals