EasyManua.ls Logo

ABB VBF Series - Page 19

ABB VBF Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
PART B Installation, Operation & Maintenance
Connection of Driving-Link with composite-lever:
These figures are of Y-pole
Remove the pin and U-Clip from the
lever arm
Rotate the Composite-Lever such that the
hole of the lever-arm matches with the hole in
Driving Link & insert the pin
Insert the Pin from back and put U-Clip
This completes the assembly.
Now fasten all the hardware.
Remove the lifting-ropes & wooden blocks.
Carry out pre-commissioning tests as
Described in Commissioning section.
Sequence - 1
Sequence - 2
Sequence - 3

Related product manuals