EasyManua.ls Logo

AccuTemp EVOLUTION Series - Preventative Maintenance Checklist

AccuTemp EVOLUTION Series
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Manual I Service and Troubleshooting
23
MP4010-1903
PM TASK DECRIPTION DAILY ANNUAL
Verify that the Steamer is level.
X
Verify the operation of the control panel. When a button is pressed the
display should register the input and a beep should sound.
X
Verify the operation of the indicator lamps.
X
Clean water fill sensors and overfill float with non abrasive metallic pad.
DO NOT use sandpaper.
X
(AUTO-FILL ONLY) Ensure unit fills with water to the water level line.
X
Inspect external drain-lines for leaks. Repair if found.
X X
Lubricate hinges and door latch with a food grade silicon spray
Monthly
Lubricate stand casters
Monthly
Inspect AC power cord for degradation or bare wires. Replace if defective
or suspect
X
Inspect door gasket for cuts and degradation. Replace if damaged. We
suggest replacing once a year.
X
Inspect Steam distribution panel gasket for cuts and degradation. Replace
if damaged. We suggest replacing once a year
X
Inspect and clean steam vent, condensate line fittings and hoses.
X
Inspect the control compartment for foreign particulate and any loose
wiring or connections.
X
Check Pressure Switch for correct operation. Recommend to replace
every two years.
X
Inspect external and internal water connections and condensate lines for
degradation and leaks. Replace as necessary
X
PREVENTATIVE MAINTENANCE
Note: Accutemp approved service providers should complete any tasks involving access to
electrical systems.

Related product manuals