EasyManua.ls Logo

Acekool CW4 - Getting Started with Installation; Applying Foam Seals and Unit Placement; Tilting Unit for Optimal Drainage

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
When handling the unit, be careful to avoid cuts from the sharp metal edges and aluminum
fins on the front and rear coils.
To be easy installation, both the left and right curtains, curtain frames, top channel, and
bottom channel, are pre-assembled in factory.
Measure the length of the upper window frame, trim the adhesive foam seal to the appr-
opriate length and apply as shown.
Carefully lift the air conditioner with a
helper to the windowsill and pull down
the sash, making sure the air conditi-
oner is centered and its bottom rail is
flush against the windowsill.
The air conditioner should be tilted
about 3° for better drainage of conde-
nsate and rainwater. Use a level: about
1/3 bubble willshow correct slant.
CAUTION
NOTE:
Applying the Adhesive Foam Seal
Placing Inside an Open Window
Adhesive
Foam Seal
About 3°
Inside
Outside
Bottom
Rail
NOTE:
Your home in sync
14

Related product manuals