2030-0(]4A Sanfinn Z' lnefallafinn
Transformer
is accessible
from
the back of
the
machine
CoNNECTORS #2,#3,#4
CONNECTOR
-'
\
P
|--?___1-ORANGE
F
l__e.__r-GREEN
€ l+
---1--1--l-:-l
F L-4-F\
n-llrE 230v
TRANSFORMER
Starting Machine
Powering Machine
l. Ensure
electrical
cord is
plugged
in and
twist locked.
2. Ensure
jumper
plug
has been
set
appropriately.
3. Ensure water
is supplied to
unit.
4. Ensure
drain is supplied to
unit.
5.
Start unit by turning on master
power
switch inside
grounds
bin door. To
allow,warm-up,
grounds
bin must
be
in
place and doors must be closed.
6. Warm-up
will
take 15-25 minutes.
7. Fill
bean
hoppers
with fresh whole
espresso
beans.
8. Place fresh milk in
the
refrigerator.
Ensure
milk
pickup
tubes
are fully
'
inserted into the milk.
JJ
Gonsumables
At
the time of installation,
the
customer
is
required to
have on hand:
.
5lbs whole espresso beans
.
'3Jbs
decaffeinated espresso beans
'
Minimum
2
gallons
milk
.
Cups, 2 sizes
Acorto
2000s/i
Technical SuPPort
4-9