EasyManuals Logo

Acson AWM 15G Technical Manual

Acson AWM 15G
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
27
Application Information AWM-G-2009
VACUUMING AND CHARGING
The precharged outdoor unit does not need any vacuuming or charging. However once it is connected,
theconnecting pipe line and the indoor need to be vacuumed before releasing the R22/R407C/R410A from
theoutdoor unit.
1) Open the service port core cap.
2) Connect pressure gauge to the service port.
3) Connect the line to vacuum pump. Open the charging manifold valve and turn the pump on. Vacuum
to–0.1 MPa (-760mmHg) or lower. (Evacuation time varies by the pump but averagely in 1 hour).
Note : R407C – Fix lter dryer
R22 - Nil
R410A - Nil
4) After evacuation, unscrew the spindle (diagram B) for the gas to run to indoor unit.

Other manuals for Acson AWM 15G

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Acson AWM 15G and is the answer not in the manual?

Acson AWM 15G Specifications

General IconGeneral
BrandAcson
ModelAWM 15G
CategoryAir Conditioner
LanguageEnglish

Related product manuals