EasyManua.ls Logo

ADC Release 3.1 - Page 58

ADC Release 3.1
489 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ADCP-70-220 Issue 1 November 2000 Section 2 Operation and Maintenance
Page 2-28
© 2000, ADC Telecommunications, Inc.
NTP-013
Page 1 of 1
CREATING CONNECTIONS
Summary: This procedure outlines the steps required to create ATM Virtual Path Connections
(VPC) and Virtual Channel Connections (VCC) through the Cellworx STN network. A VCC is
an individual channel between two communicating systems. The VPC allows multicasting of
several VCCs to ease routing between switches where multiple VCCs share a common path. The
VPCs are a common requirement of WAN installations. The administrator should have acquired
a work order defining the bandwidth requirements, service type, and Quality of Service (QoS)
for each connection before proceeding.
1. Creating traffic contracts. DLP-709
2. Create an ATM VP or VC connection through the Cellworx
STN system. DLP-708
3. Create an ATM VP Multicast Connection. DLP-787
4. Create an ATM Bundled VC Multicast Connection. DLP-790
5. Add a Leaf Endpoint to an In-Service Connection. DLP-791
Stop! You have completed this procedure.

Table of Contents

Related product manuals