Par-t
B:
1
2
2.1
2.2
2.3
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.8.1
3.8.2
3.8.3
3.9
3.9.1
3.9.2
3.9.3
3.10
3.10.1
3.10.2
4
4.1
4.2
4.3
4.3 1
4.3,2
4.3,3
Survey of the Inspection-, Maintenance- and Reconditioning Works
Inspection
Maintenance
Reconditioning
Notes for the W:irks to be performed
Safety Precaut i:>ns
Cbeck of the AnI i-Condensation Heating
Functional Chec~-of the Electrical Control Circuits
Measurement of the Operating Times
Check of the SF~ Gas Quality
Measurement of the Resistance of the Main Circuit
Check of the Bolt Connections
Replacement of 1he Arcing Contacts
Preliminary Remr.rks
;--,::-isions
Procedure
Disassembling ol a Complete Pole Column
Preliminary Remr.rks
Provisions
Procedure
Cleaning, Greasing and Lubricating of the Operating Mechanism
Preliminary Remr.rks
Replacement of farts
Lubrication and Greasing
Designation.of .ubricants
Application of ~ubricants
Points of Lubrication
Pole Column
Base Frame
Linkage