To be carried out ly trained staff or AEG specialists. Take the
drCldt-breaker
out
of serv~ce. an
nr
1
':,ning of the
pole
c~::.!m:1s
i$
not necessary.
fixed inside the operating
mechanism cubic'le
Check of the securing elements
of the linkage
- Functional check of the
electrical control circuits
- Measurement of tile operating
times
chapter 3.5
chapter 3.6- Measurement of t~le res i stance
of the main circllit
2.3
Reconditioning
To be carried out by trained staff or AEG specialists. Take the
circuit-o-reaker out of service, an opening of the pole columns is-
necessary.