EasyManua.ls Logo

AERZEN GM 150S User Manual

Default Icon
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ENGLISH
G4-001 N EN
Translation of the original instructions
1
AERZENER MASCHINENFABRIK
GMBH
G4-001 N EN
168 397 000 01-2012
Installation, assembly and operating instructions
for rotary piston blower stage
Rotary piston blower stage
Question and Answer IconNeed help?

Do you have a question about the AERZEN GM 150S and is the answer not in the manual?

AERZEN GM 150S Specifications

General IconGeneral
TypeRotary lobe blower
Connection SizeDN150
Nominal Size150 mm
DriveDirect drive
Max. Pressure1, 000 mbar
Speed3000 rpm
Noise Level75 dB(A)

Summary

Declaration of Incorporation

Wearing Parts Drawing - Blower Stage

Construction and Function

Blower Stage Setup

Installation, piping connection, oil level check, and driving element assembly for the blower stage.

Unit and System Installation

Proper installation in a unit/system, ensuring safety and avoiding housing distortion.

Due Care Before and During Operation

Unit Assembly Precautions

Seal flange connections, avoid dirt ingress, remove covers just before ducting.

General Operation Safety

Comply with safety regulations, operate in original condition, and ensure electrical safety.

Commissioning Safety Instructions

Read instructions before commissioning, use qualified personnel, ensure shutdown system.

Residual Risk Safety

Observe warning signs, check for damage, avoid exposed parts, and use suitable tools.

Hazardous Operation Warnings

Repairs by professionals, disconnect power before maintenance, and handle materials safely.

Inadmissible operating methods

Foreseeable Misuse Scenarios

Operating without lubricant, with excessive lubricant, soiled filter, or poor ventilation.

Incorrect Operation and Use

Handling dust contamination and gases with solid particles requires specific procedures.

Transport / Installation / Assembly

Machine Transport

Avoid impact loads, use appropriate lifting gear, and ensure stable suspension.

Installation and Assembly Procedure

Install on an even foundation, ensure ventilation, and remove protective plugs.

Commissioning

Initial Commissioning Steps

Top up lubricating oil, check oil level, and verify plug and valve security.

Frequency converter operation

Maintenance

Malfunction / Possible cause / Remedy

Spare parts - overview

Related product manuals