FILE VER LAST ISSUE LANG. PAGE
GCM02-M-USO-INGLESE.doc SDG/02 18/11/2005 ENG Page 3 of 12
1. to know the operating principle of the unit;
2. to understand the control panel signals;
3. to handle it during the different service operations;
4. to carry out the basic checks necessary to ensure the efficiency of the generator itself.
Technical or adjustment matters have not been considered. The installer is in charge for them when setting up
the system.