EasyManua.ls Logo

AFG 5.3AE - Assembly Steps 2 & 3

Default Icon
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1312
HARDWARE FOR STEP 2
PART TYPE QTY
D BOLT 4
E FL AT WAS H ER 4
B SPRING WASHER 4
F NUT 4
ASSEMBLY STEP 2
D
3
2
E
B
A Open HARDWARE FOR STEP 2.
B Align GUIDE RAIL SET (3) with MAIN
FRAME (2) as shown.
C Attach the GUIDE RAIL SET (3) to
the INCLINE BRACKET (4) using
4 BOLTS (D), 4 FLAT WASHERS (E),
4 SPRING WASHERS (B) and
4 NUTS (F).
HARDWARE FOR STEP 3
PART TYPE QTY
G BO LT 4
H SPRING WASHER 4
I FL AT WAS H ER 4
ASSEMBLY STEP 3
2
3
H
I
G
A Open HARDWARE FOR STEP 3.
B Attach the GUIDE RAIL SET (3) to the
MAIN FRAME (2) using 4 BOLTS (G),
4 SPRING WASHERS (H) and 4 FLAT
WASHERS (I).
AFG14_3.3AE_5.3AE_7.3AE_OM_r1_4.indd 12-13 5/20/14 9:12 AM

Related product manuals