164 Agilent InfinityLab LC Series 1260 Infinity II Isocratic- and Quaternary Pumps User Manual
8
Maintenance
Reinstall the Pump Head Assembly
9
Close the doors.
Next Steps:
10
If a standard seal has been installed, run the seal
wear-in procedure, which includes a replacement of the
purge valve frit (“Seal Wear-in Procedure” on page 165).
11
For the normal phase seal, the purge valve frit should be
replaced, see “Exchange the Purge Valve Frit or the
Purge Valve” on page 146.