EasyManuals Logo

AirCycler g1 Installation Testing Guide

AirCycler g1
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
AirCycler® g1 Installation Testing Guide
®
Testing the AirCycler® g1 completed installation is a
simple process that includes testing the controllers
connection to the thermostat, fresh air damper and
furnace.
LCD DISPLAY
OA - FRESH AIR DAMPER
IS OPEN
PERCENTAGE OF VENTILATION
COMPLETE
FAN ON FROM
THERMOSTAT
See reverse for troubleshooting tips and frequently asked questions
PLEASE FOLLOW THE STEPS BELOW
1. Turn thermostat FAN setting to ON.
2. Conrm AirCycler® g1 display shows FAN and OA (damper open).
3. Conrm furnace fan is running.
4. Remove AirCycler® g1 from its base. Conrm furnace fan has shut o.
5. Place the AirCycler® g1 back on the base.
6. Turn thermostat FAN setting back to AUTO to return to normal operation.
7. Conrm that AirCycler® g1 display shows number/percentage complete.
Testing is complete

Other manuals for AirCycler g1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AirCycler g1 and is the answer not in the manual?

AirCycler g1 Specifications

General IconGeneral
BrandAirCycler
Modelg1
CategoryController
LanguageEnglish