Installation
17
3.1 Installation Preparation
Unpack the unit carefully. Some parts are packed loosely and may move as the packaging is opened. Before
discarding the box, check the packaging carefully for any parts or documents inside. Refer to Table 3 on Page
13 for the complete list of materials shipped with each unit.
Check that:
The supply voltage meets the nameplate voltage ±10%. Exception: Models designated 230V can accept 197-
253VAC
The install location is clean on the inside and free of excess dirt and dust.
Minimum install clearances are met (see “Clearances” on Page 22).
All installer provided items, listed in Table 4 on Page 14 are accounted for.
Installation and startup must be performed by an AIRSYS Authorized Service Technician (AAST). For more
information about the AAST program, please contact:
AIRSYS Cooling Technologies
support@air-sys.us
855-874-5380
Danger. All the installation work must be done by professional technicians. Installation that does
not comply with the instructions herein can result in the loss of warranty coverage. AIRSYS shall
not be held liable for any damage caused to persons or objects due to incorrect installation or
operation of the units.
Warning. All wiring must comply with the local safety standards and building codes under all
circumstances.
Warning. Risk of electric shock can cause injury or death: disconnect all remote electric power
supplies before installation.
When no longer in use, disposal of equipment and materials must be compliant with local laws and standards.
3.1.1 Delivery
When the units are delivered, be sure to inspect them to verify that they have not been damaged during
transport. Also verify that all requested accessories listed on the purchase order have been included.
Important. If packages show any signs of shipping damage or potential shipping
damage, it is very important to annotate shipping damage on the Bill of Lading
prior to signing for the freight. In order to recover for any damage, please take
detailed photographs of all the packaging before the external packaging is
removed. Once detailed photos of the external packaging have been taken, then
the external packaging may be removed so the items can be inspected further.
Please document with photos any damage to the equipment that relates directly
to the damage observed to the external packaging. Without the detailed photos,
it will be very difficult to recover equipment loss.