Do you have a question about the Allied A95UH and is the answer not in the manual?
Crucial warnings regarding personal injury, property damage, and operational hazards.
Warning about exposure to fiberglass wool insulation during handling and service.
Hazards related to gas leaks, explosions, and fumes from propane or PVC glue.
Guidance on selecting installation sites and required clearances for safe operation.
Procedures for installing intake, exhaust, and termination components according to codes.
Instructions for installing condensate traps and drain lines to ensure proper drainage.
Steps for connecting gas supply, checking pressure, and ensuring proper flow.
Guidance on wiring, grounding, and connecting electrical components and controls.
Information on blower speeds, performance data, and adjustments.
Details on the control board, hot surface ignition, and start-up sequence.
Comprehensive checklists for initial setup, operation verification, and performance monitoring.
Procedures for annual inspection, cleaning of heat exchanger, burners, and traps.
Annual checks, diagnostic codes, and troubleshooting guidance for planned maintenance.
List of available replacement parts for various furnace assemblies.
Specific installation, signage, and CO detector rules for Massachusetts.
Requirements for manufacturers regarding provided or special venting systems.
Crucial warnings regarding personal injury, property damage, and operational hazards.
Warning about exposure to fiberglass wool insulation during handling and service.
Hazards related to gas leaks, explosions, and fumes from propane or PVC glue.
Guidance on selecting installation sites and required clearances for safe operation.
Procedures for installing intake, exhaust, and termination components according to codes.
Instructions for installing condensate traps and drain lines to ensure proper drainage.
Steps for connecting gas supply, checking pressure, and ensuring proper flow.
Guidance on wiring, grounding, and connecting electrical components and controls.
Information on blower speeds, performance data, and adjustments.
Details on the control board, hot surface ignition, and start-up sequence.
Comprehensive checklists for initial setup, operation verification, and performance monitoring.
Procedures for annual inspection, cleaning of heat exchanger, burners, and traps.
Annual checks, diagnostic codes, and troubleshooting guidance for planned maintenance.
List of available replacement parts for various furnace assemblies.
Specific installation, signage, and CO detector rules for Massachusetts.
Requirements for manufacturers regarding provided or special venting systems.
| Fuel Type | Natural Gas |
|---|---|
| AFUE | 95% |
| Blower Motor | Variable Speed |
| Heating Capacity | 40, 000-120, 000 BTU/h |
| Stages | 2 |
| Warranty | 10 years |





Loading...