Alpha ESS Co., Ltd.
Page 9 of 16
Your Smart Energy
Max Feed-in
In some countries there is regulation for PV feed-in rate or it must be zero export.
After setting the PV capacity you can set this parameter on EMS LCD or on Alpha
Cloud portal. Then the grid feed-in power from the PV generation will be limited.
Note: in AC mode system Alpha ESS can’t limit other PV-inverter generated
power.
5.1 Setting on EMS LCD
5.1.1 SMILE5
Set on-grid capacity (How much kWp is installed with the on-grid inverter), storage
capacity (How much kWp is installed with the AlphaESS storage inverter) and number
of PV strings (MPPT number).
Click the Grid Function to set up relevant parameters about the grid.