EasyManua.ls Logo

Alpha CD12S - Benchmark Checklist

Alpha CD12S
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
Alpha CD12S/20S/28S - Benchmark Checklist
Ensure the following is completed after the boiler has been installed and commissioned:-
BOILER SERIAL No. ...........................................................NOTIFICATION No. ............................................................
CONTROLS
To comply with the Building Regulations, each section must have a tick in one or other of the boxes
Time & temperature control to heating
Time & temperature control to hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator valves
Automatic by-pass to system
FOR ALL BOILERS CONFIRM THE FOLLOWING:
The system has been flushed in accordance with the boiler manufacturer's instructions? Yes No
The system cleaner used .....................................................................................................................
The inhibitor used .................................................................................................................................
FOR CENTRAL HEATING MODE, MEASURE AND RECORD THE FOLLOWING:
Gas rate m³/hr ft³/hr
Burner operating differential pressure (if applicable) N/A mbar
Central heating flow temperature °C
Central heating return temperature °C
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING:
The condensate drain has been installed in accordance with the manufacturer's instructions? Yes
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING:
The heating and hot water system complies with current Building Regulations Yes
The appliance and associated equipment has been installed and commissioned
in accordance with the manufacturer's instructions Yes
If required by the manufacturer, have you recorded a CO/CO
2
ratio reading N/A Yes CO/CO
2
ratio
The operation of the appliance and system controls have been demonstrated to the customer Yes
The manufacturer's literature has been left with the customer Yes
COMMISSIONING ENG'S NAME:
Print .......................................................................Gas Safe ID No. ................................................
Sign ........................................................................Date ..................................................................
room t/stat & programmer/timer
cylinder t/stat & programmer/timer
Fitted
Fitted
Fitted
Fitted
Programmable roomstat
Combi boiler
Not required
Not required
Not required
12 CHECKLIST

Related product manuals