MULTIPOINT INSTALLATION
Installation & Test Run is very similar to single point water heater. Several areas need to be taken note
1 2 3
1. Identify INLET and OUTLET
2. Install the given Pressure Relief Valve at the INLET
3. Turn the mixer tap to the left (Hot) and let water flows through the tap before turning on the
heater switch out side the bathroom. This is applicable during 1
st
time installation to prevent damage
to the heating element.
After the above you may use the mixer tap as how you would use a mixer tap.
Pressure
Relief
Valve
24