EasyManua.ls Logo

Alphacool EISBALL - Tubing and Commissioning

Alphacool EISBALL
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eisball Alphacool International GmbH
24
TUBING AND COMMISSIONING
Connect the tubes to the thread inputs marked with IN and OUT
The other thread input must be closed by the screw plug:
Now fill the Eisball with a funnel through the upper fillport. The optimal filling height is
10mm below the upper fillport opening:
Use the screw tool.
10 mm
We only recommend clear coolants
from our own production (CKC or
Eiswasser Crystal - no UV!) or pure
distilled or osmosis filtered water.
After commissioning the pump for the
first time, the water level drops.
Therefore, liquid should be refilled
during use.