Maintenance
Disassembly and assembly of the GCB equipments
G51
-
-5
00EN01
9/10
02--2011
© ALSTOM 2010. All rights reserved. Informat
ion contained in
this document is indicative only. No
representati
on or
warrant
y is
given or should
be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liabili
ty and
is subject to
change without notice. Reproduction, use or disclosure to
third parties, without express writt
en authority, is
strictly prohibited.
GRID
Equipments removal
Procedure
Rei
nsta
ll
the
TC,
VT
s,
cap
aci
tors
and
surg
e
arre
stor
s
on
the
sup
por
ts
resp
ecti
ng
the
loc
atio
n
mark
s
dur
ing
the
dis
ass
embl
y
,
usi
ng
the
bol
ts
(A-
-B-
--
C--E--F) to refer disassemble procedure and proceed as follows :
D
Reinstall the supports equipped on the top of GCB enclosure.
D
Pre
par
e
the
ele
ctric
al
con
tact
sur
face
s
(see
mod
ule
“Co
nne
ctio
n
with
ele
c-
trical
surfaces preparation”)
.
D
Reinstall the grounding braid of the VT to the enclosure
D
R
ec
on
ne
ct
th
e
te
rm
in
al
s
a
nd
ch
e
ck
th
e
el
em
en
ta
ry
di
ag
ra
m
(VS......EDD01D).
D
Tigh
tening torque application (see module
“Tig
htening torques”).
ATTENTION :
Re
sp
ec
t
the
sp
ec
ifi
c
tig
hte
ni
ng
tor
qu
e
on
the
VT’
s
as
he
re
af-
ter
.
J
:
-- Primary (braide) HM10--20 =
1.5 daNm
-- Primary (braide grounding to the GCB enclosure)
HM8--12 =
0.8 daNm
-- Secondary M6--12 =
0.3 daNm
.
NO
TE
:
The
len
ght of
the
bra
ide
s
sha
ll
be
res
pec
ted as
initi
al locatio
n
HM8--12
M6--12
x1
x5
Secondary
terminals
Primary
terminal
.
J
H1
H2
HM10--20
1.5daNm
0.3daNm
0.8 daNm