EasyManua.ls Logo

amiad TAF-750 - User Manual

amiad TAF-750
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
AMIAD Water Systems Ltd.
3" TAF-750 FILTERS
Serial number:
Order number:
Catalog number:
Filtration degree:
Tested by:
Installation, Operation and
Maintenance Instructions
Ref. 910101-000116 /12.2018
Question and Answer IconNeed help?

Do you have a question about the amiad TAF-750 and is the answer not in the manual?

Summary

Technical Specifications

General Specifications

Technical specifications for the filter, including flow rate, pressure, and dimensions.

Flushing Data

Details on flushing cycle time, water usage, and criteria for flushing initiation.

Control and Electricity

Information on operating voltage, motor power, current consumption, and control voltage.

Construction Materials

Lists materials used for filter housing, screens, cleaning mechanism, and seals.

Filtration Degrees

Table showing filtration degrees in microns and millimeters.

Safety Instructions

General Safety Precautions

General safety precautions for filter installation and maintenance.

Installation Safety Guidelines

Specific safety guidelines for installing the filter and its components.

Operation and Maintenance Safety

Safety measures during filter operation, control, and maintenance procedures.

Lifting Equipment Safety

Safety instructions for using lifting equipment when handling the filter.

Dimensional Drawings

Filter Operation Description

Filtering Process

Explains how water flows through the screen and filtration cake accumulation.

Self-Cleaning Process

Details the automatic self-cleaning mechanism using a suction scanner and exhaust valve.

Installation Guide

Design Recommendations

Provides guidance on flushing flow requirements and check valve installation.

Installation Instructions

Step-by-step instructions for installing the filter, including valve and pipe connections.

Start-Up and First Operation

Maintenance Procedures

Filter Checking

Procedures for inspecting and cleaning the filter screen and its components.

PD Switch Connector Check

Instructions to verify the PD switch connectors for obstructions.

Winterization Procedure

Steps to prepare the filter for freezing temperatures, including draining and valve closure.

Leak Handling

Guidance on what to do in case of filter leaks, advising contact with technical support.

Parts Schedule - Section 1

Parts Drawing - Section 1

Parts Schedule & Drawing - Section 2

Control Drawing

Amiad Limited Warranty

amiad TAF-750 Specifications