2 Amico Clinical Solutions Corp.
Contents
Introduction 4
Symbols used in this Manual 4
Markings 4
Typical Drawings 5-6
Technical Data for iCE Lightheads 7
Installation Considerations 8
Tools and Part Requirements 9
Safety Instructions 9-11
Static Inspection 12
Declaration of Acceptance 12
Components and Scope of Delivery 13
Installation
Installation: Structure Plates and Flanged Ceiling Tube 14-17
Structure Plate and Anchor Plate 14
Order Components for each threaded Rod 15
Installing the Flanged Ceiling Tube 16-17
Installation: The Central Axis 17-20
Installing the Ceiling Cover 17
Amico Ceiling Covers 18
Installing the Central Axis Core 19
Installing the Central Axis Arms 20
Installation: Electrical 21-22
Labelling of The Extension Leads 21
Routing The Extension Leads 21-22
Routing the Supply Lines Through the Ceiling Tube 22
Grounding the Flange 22
Connecting the Power Supply 22
Installation: Spring Arms 23-26
Standard Spring Arms on the Central Axis 23
Initial Setup 24
Installing/Removing the Spring Arm 24-25
Removing the Safety Plug 26
Installation: Amico iCE LED Light 27
Installing the Lighthead 27-28
Normal System/LCH with Camera 29-31
Installing in Light Camera (Optional Accessory) 32
Connecting the Camera Controller Box 32