EasyManua.ls Logo

Ammann ASC Series - Page 22

Ammann ASC Series
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
SAFETY PRECAUTIONS
PROVIDE SIGNALS FOR JOBS INVOLVING
A NUMBER OF MACHINES
For jobs involving several machines, provide signals
commonly known by all personnel involved.
Also, appoint a signal person to co-ordinate the job
site.
Make sure that all personnel obey the signal person’s
directions.
PARK MACHINE SAFELY
Before working on the machine:
- Park machine on a level surface.
- Lower bucket to the ground.
- Move turret swing lever to lock position.
- Run engine at slow idle speed without load for
3 minutes.
- Turn key switch to OFF to stop engine. Remove
key from switch.
- Pull pilot control shut-off lever to LOCK position.
- Allow engine to cool.
- Close windows, roof window, and cab door.
- Lock all access doors and compartments.
NEVER WORK UNDER PROJECTING
BANKS
The edges could collapse o a land slide could occur
causing serious injury or death.
MANUALEQUIPOSPESADOS.COM manualequipospesados@gmail.com

Related product manuals