EasyManua.ls Logo

Ampeak CGUFB2008 - 3-Stage Charging Process

Ampeak CGUFB2008
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If charging with 6V gear, it will be 3-STAGE CHARGING
3-STAGE CHARGING
First Stage - Bulk Charge: Delivers maximum charging amperage
to "wake up" any serviceable 6 volt battery. When battery reaches a
maximum safe predetermined voltage, the charger will automatically
move into Stage 2 of the charging process.
Second Stage - Absorption: Maintains the maximum possible
charge at a constant, safe, predetermined voltage. During this phase,
the charging voltage remains constant, while the actual charging
current is reduced to allow for the maximum proper internal chemical
energy transfer. At the end of Stage 2, the charger will automatically
move into Stage 3 charge mode.
Third Stage - Float Charge: Voltage is automatically maintained
and reduced to a predetermined level while current is adjusted for a
safe, effective battery charge.
1-Bulk charge 2-Absorption 3-Float
CUPPENT VOLTAGE
1-Desulfation 2-Soft Start 3-Bulk Charge 4-Absorption 5-Battery Test 6-Recondition 7-Float
CUPPENT VOLTAGE
14

Related product manuals