Basic Solar Charging
Smart Energy Management
This is installed around the live mains input supply, close to the domestic energy
meter (Fig:1).
A twisted pair shielded signal cable should be used to connect the CT clamp to the
Andersen chargepoint (Fig:2). The cable length between the CT clamp and
chargepoint should not exceed 30 meters.
This can be purchased from Andersen EV.
This CT clamp is specifically calibrated for use with the A2 unit.
f
(
x
)
b
ff
and f
Andersen EV Solar Charge
Installation Guide
AEV-SC-05052020-IST 1.1-UK