Table of Contents
12-1-01
Page 3
Form No. Pages
V. DESIGN (Continued)
RESERVE SYSTEM 5-16
DEVELOP BILL OF MATERIALS 5-16
“INERGEN” DESIGN CALCULATIONS WORKSHEET F-2001293 5-17
FLOODING FACTOR CHART 5-18 – 5-19
ATMOSPHERIC CORRECTION FACTORS CHART 5-20
DISCHARGE TIME CHART (FOR CLASS A FIRES) 5-21
PIPE SIZE ESTIMATION CHART 5-22
MAXIMUM PIPE PRESSURE CHART 5-23 – 5-25
EQUIVALENT LENGTH CHART 5-26
NOZZLE/PRESSURE REDUCER RANGE CHART 5-27
VI. INSTALLATION 6-1 – 6-17
MOUNTING COMPONENTS 6-1 – 6-4
Cylinder/Bracket Assembly 6-1 – 6-3
Releasing Devices 6-4
INSTALLING ACTUATION PIPING 6-4 – 6-5
General Piping Requirements 6-4
Actuation Piping Installation 6-5
INSTALLING DISTRIBUTION PIPING 6-6 – 6-11
Hanger Applications 6-6
General Piping Requirements 6-6 – 6-8
Distribution Manifold and Piping Installation 6-9 – 6-11
MAIN/RESERVE SYSTEM 6-11
INSTALLING DETECTION/ACTUATION SYSTEM 6-12
AUTOPULSE Control System with Electric Actuator 6-12
AUTOPULSE Control System with ANSUL AUTOMAN II-C Release 6-12
with Pneumatic Actuation
INSTALLING ACTUATOR 6-13 – 6-14
Pneumatic 6-13
Manual 6-13
Electric 6-14
Booster Actuator 6-14
HF Actuator 6-14
INSTALLING ACCESSORIES 6-14 – 6-17
Manual Pull Station 6-14 – 6-16
Alarms 6-16
Pressure Trip 6-16 – 6-17
Pressure Switch 6-17