EasyManua.ls Logo

AQUAFLAME 800 User Manual

Default Icon
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
AQUAFLAME AT THE HEART OF THE WORKSHOP !
Aquaflame Systems Ltd, 34 Augusta Street, Birmingham B18 6JA, UK.
T: +44(0)121-233-1088 E: sales@aquaflamesystems.com. W: www.aquaflamesystems.com
Company registration No: 02060723 VAT No: GB 443 6307 60
Getting Started V3 201-1-2017
GETTING STARTED WITH AQUAFLAME SET UP
INSTRUCTIONS
Thank you for purchasing an Aquaflame. If set up correctly your Aquaflame will give many
years trouble free operation. Before starting work it is necessary to fill the cell and the
booster, connect the torch and perform a leak test. The document below lays out the
procedure.
Please read the MSDS information relating to the Electrolytes and MEK this can be found
on the Aquaflame website in Manuals & Literature. Both materials should be handled with
care. The electrolyte flake / solution is highly corrosive and the MEK is flammable. Please
handle both materials with care.
To ensure best results please follow these instructions with care.
1. FILLING THE CELL
!
It is necessary to fill the cell with Electrolyte crystals. These are dissolved in water.
PLEASE NOTE THAT IT IS VERY IMPORTANT NOT TO OVERFILL THE CELL.
ALWAYS WEAR ADEQUATE FACE & HAND PROTECTION
The filling of the Cell is done in three stages:
1. Mixing of the electrolyte crystals with deionized water
2. Filling the machine to the bottom of the sight tube with an initial fill so that the liquid
contents of the cell are visible at the bottom of the sight tube
3. Topping up the contents of the cell to the correct level.
Question and Answer IconNeed help?

Do you have a question about the AQUAFLAME 800 and is the answer not in the manual?

AQUAFLAME 800 Specifications

General IconGeneral
BrandAQUAFLAME
Model800
CategoryLaboratory Equipment
LanguageEnglish

Summary

Getting Started with Aquaflame Setup

Filling the Cell

Instructions for filling the electrolyte cell with deionized water and crystals.

Filling the Gas Booster

Procedure for filling the gas booster with MEK (Methyl Ethyl Ketone).

Connecting the Gas Booster and Torch

Guide to connecting the gas booster and torch hoses to the machine.

Starting Up the Machine

Steps for powering on the machine and initial checks using indicator lights.

Top Up of Cell and Booster Liquids

Instructions for topping up electrolyte cell and booster MEK levels.

Checking for Gas Leaks

Method for detecting gas leaks using indicator lights and checking connections.

Installation of the Machine

Guidelines for positioning the machine for optimal airflow and hose length.

Daily Maintenance

Routine checks for liquid levels in the cell and booster.

Overfilling the Cell

Action to take if the cell is accidentally overfilled.

Contact Details

Information for contacting Aquaflame Systems Ltd for support or questions.